We are
Eugen Bader
Diplom Ingenieur (FH) in process and environmental engineering

Born in: 1979
Education: Degree in process and environmental engineering at the Heilbronn University of Applied Sciences, including an internship at Symyx Technologies Santa Clara-CA, USA
Language skills: English, Russian
Professional experience:
Since 2011: Tiede-&Niemann Ingenieurgesellschaft mbH, Hamburg
2005 – 2010: Project engineer at Steinbeis-Transferzentrum Verfahrens-, Energie- und Umwelttechnik, Heilbronn
Main projects:
- Assessment and optimization of scrubbers for cruise ships, Primarine GmbH
- Planning of a heat transfer system using thermal oil
- Planning support for Stadtreinigung Hamburg in the construction of a resource and energy centre for the Hamburg EfW and bioenergy facilities
- Feasibility study on heat recovery and raising temperature by means of a thermal pump for the waste incineration plant Kiel
- Calculation of pressure losses in the exhaust-gas system upstream the scrubber, ERC Technik GmbH
- Basic engineering EGCS in the marine sector, ERC Technik GmbH
- Planning and implementation of a tank system for landfill leachate, AVG Köln
- Enhancement of electrostatic precipitator, AVG Hamburg
- Basic engineering SCR-plant, Delfzijl, The Nethetherlands
- Study on the optimization of the flue-gas cleaning system, AVG Hamburg
- Planning of a heat exchanger for pre-heating the flue gas upstream the SCR catalyst, MV Kiel
- Feasibility study for the construction of a new steam turbine, BSR Berlin
- Planning and implementation of a vapour scrubber, MVA Bielefeld
- Planning and implementation of an aqueous ammonia injection system, MVA Bielefeld
- R1-calculations for MVA Hagen, MVA Hamm and MHKW Ruhleben
- Planning and implementation of a reducing station, AMK Iserlohn
- Study on heat recovery upstream the scrubber, SRH
- Assessment of the catalyst for denoxing, MHKW Ruhleben
- Planning and implementation of system recycling the wastewater in the scrubbers, VERA Hamburg
- Renewal of flue-gas cleaning system in the sewage sludge incineration plant, Berliner Wasserbetriebe
- Optimization of ash loading system, VERA Hamburg
- Study on heat recovery from waste steam for greenhouses, ZAS Burgkirchen
- Planning and implementation of aqueous ammonia tank, MAK Rostock
- Planning work for solar power plant in Doem-Bang, Thailand
- Calculations for packed-bed scrubber to optimize operation, MVA Bielefeld